<< Click to Display Table of Contents >> Navigation: EQuIS Library > Reports > EarthSoft Standard Reports by Product > Standard with SPM > SPM - Completeness Table - Analytical Results Report |
Report Name: SPM - Completeness Table - Analytical Results (example)
File Name: EarthSoft.Reports.Library.48827.dll
Dependencies: Licensed SPM and SPM Schema
Software: SPM
Source: SPM install
Language: English
Output Type: Report Grid with options for Excel1 and CrossTab
Description: The SPM - Completeness Table - Analytical Results report gives a comparison between analytical and field results that had been scheduled to occur and the data that has been received in the EQuIS data tables. The report grid has a Status column to show complete and incomplete tasks. This report is intended to generate a grid output to be used in Enterprise and Microsoft Power BI Dashboards.
Installation Instructions: This report requires a licensed SPM and the SPM Schema applied to the database.
•For SPM usage, no additional steps are necessary.
•For Enterprise usage, this report should be published to the database. The report will be available for selection once it has been published.
•For Professional usage, this report should be published to the database or have the .dll added to the local '.../Earthsoft/EQuIS/' folder.
Overview: The comparison may use the SYS_SAMPLE_CODE if 'Check by SPM sys_sample_code'= True. If DT_SAMPLE.SYS_SAMPLE_CODE do not match DT_SPM_SCHEDULED_SAMPLE.SYS_SAMPLE_CODE because the sample codes are often not determined until the date and time the sample is actually collected, then set that parameter to False.
If False, the comparison is made by comparing the following fields from DT_SPM_SCHEDULED_SAMPLE and DT_SAMPLE:
•TASK_CODE
•SYS_LOC_CODE (optional based on check box in Parameters)
•SAMPLE_TYPE, MATRIX (if not null)
•DEPTH (if not null)
As well as the following fields from DT_SPM_SCHEDULED_RESULTS and DT_TEST/DT_RESULT:
•CAS_RN
•FRACTION
•METHOD (optional based on check box in Parameters)
•LAB (optional based on check box in Parameters)
It is also possible for samples to matched based on DT_SAMPLE.SPM_SAMPLE_ID, which can be populated using Collect.
The status column is set based on the following:
•Completed: DT_SPM_SCHEDULED_RESULT needs matching records in DT_TEST/DT_RESULT
•Incomplete: No matching record for DT_SPM_SCHEDULED_RESULT in DT_TEST/DT_RESULT
•SRN Issues: If using the SRN Manager and SRN issues have been received, added in DT_SRN_ISSUE
•Not Taken: The sample type in DT_SAMPLE is changed to NST (no sample taken)
•Validated: DT_RESULT.VALIDATED_YN is set to 'Y'
Source Tables DT_FACILITY, DT_SAMPLE, DT_FIELD_SAMPLE, DT_LOCATION, DT_COORDINATE, DT_SPM_SCHEDULED_SAMPLE, DT_SPM_SCHEDULED_TASK, DT_SPM_SCHEDULED_RESULT, DT_SPM_CONTRACT, DT_SPM_CONTRACT_CONTAINER, DT_SPM_CONTRACT_MAG, DT_SRN, DT_SRN_AMENDMENT, DT_SRN_ISSUE_TEST, DT_SDG, DT_CHAIN_OF_CUSTODY_MAG, DT_CHAIN_OF_CUSTODY, DT_CHAIN_OF_CUSTODY_MAG_MEMBER, DT_TEST, DT_SPM_PLANNED_TASK, DT_SPM_COMMITMENT, RT_GROUP, RT_GROUP_MEMBER
Report Parameters |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
1Excel report output requires a valid license of Microsoft Excel to view the output.
Copyright © 2024 EarthSoft, Inc. • Modified: 06 Dec 2023