<< Click to Display Table of Contents >> Navigation: EQuIS Library > Reports > EarthSoft Standard Reports by Product > Standard with SPM > EIAs (EQuIS Information Agents) > EIA: Late Results Report |
Report Name: EIA: Late Results
File Name: EarthSoft.Reports.Library.48827.dll
Dependencies: Licensed SPM and SPM Schema
Software: SPM
Source: SPM install
Language: English
Output Type: Excel1
Description: The EIA: Late Results report can be used to notify users of SDGs (a.k.a. work orders) that have been received (ST_FILE_REGISTRATION.RECEIVED_DATE) after the expected result reporting date (DT_SRN.SCHEDULED_REPORTING_DATE).
Installation Instructions: This report requires a licensed SPM and the SPM Schema applied to the database. For SPM usage, no additional steps are necessary. For Enterprise use, this report should be published to the database. When publishing the report, the assembly should be stored in the database. The report will be available for selection once it has been published.
Overview:
This report is setup as an EQuIS Information Agent (EIA) only. Instructions on how to setup EIAs may be found here.
Tables: AT_SAMPLE_SDG, DT_FACILITY, DT_SDG, DT_SRN, DT_TEST, ST_FILE_REGISTRATION
Input Parameters * |
---|
This report contains no input parameters |
* This report contains the following hidden parameter(s) that could affect the outcome of the report: •Facility_ID
If listed, the Additional Fields parameter may be customized as explained in How To Customize the Additional Fields Parameter.
Consult an EQuIS administrator if hidden parameters should be visible or use different default values in a published report (a report that allows saving of user reports). Hidden parameters cannot be viewed or changed in unpublished reports outside of a report parameter file.
|
Report Output |
---|
FACILITY_CODE SDG_NAME DAYS_LATE |
1Excel report output requires a valid license of Microsoft Excel to view the output.
Copyright © 2024 EarthSoft, Inc. • Modified: 28 Mar 2024